F
FORTH ROPE ACCESSScotland
Offshore oil platform
All Services
Industrial Service

Oil & Gas Platform Inspection & Maintenance

Offshore platform inspection, flare stack access, FPSO maintenance and coating application. OPITO-compliant rope access teams. 24-hour mobilisation from Edinburgh.

/ Services Offered

Capabilities

Platform Structural Inspection

Legs, nodes, braces, and decks surveyed inside and out. Crack mapping, corrosion assessment, and anode condition recorded with high-res photography.

Flare Stack Inspection & Repair

Live flare stack access for NDT, guy wire inspection, pilot line checks, and structural repair. No shutdown required.

FPSO Hull & Turret Access

Anti-corrosion coating, steel renewal, and turret bearing inspection from ropes. Eliminate dry-docking for routine maintenance.

Coating & Corrosion Protection

Sa 2½ surface prep, epoxy primer, and polyurethane topcoat application to NORSOK M-501 and ISO 12944 C5-M standards.

Anode Replacement

Cathodic protection anode survey, replacement, and installation on jackets, monopiles, and FPSO hulls.

Confined Space Tank Inspection

Entry, cleaning, and inspection of storage tanks, ballast tanks, and process vessels. Stand-by rescue team rigged before entry.

Rigging & Lifting Operations

Offshore rigging, material handling, and lifting point inspection. LOLER-compliant thorough examinations from rope access.

Drop Object Surveys

Systematic survey of derrick, cellar deck, and module areas for loose items. Secondary retention installation where required.

/ Certifications

Offshore Qualified

IRATA

International Rope Access Trade Association Level 3 supervisory certification. Annual re-validation.

OPITO Stage 1/2/3

Offshore Petroleum Industry Training Organisation. Rigger, banksman, and rope access technician standards.

BOSIET / FOET

Basic Offshore Safety Induction and Emergency Training. Helicopter escape, sea survival, fire-fighting, and first aid.

OGUK Medical

Oil & Gas UK offshore medical examination. Fit for work in the UK Continental Shelf.

PCN NDT

Personnel Certification in Non-Destructive Testing. UT, MPI, DPI Level 2 inspectors with rope access capability.

/ Case Study

Proven in the Field

FPSO at sea
Area Coated
2,400m²
£800k
Downtime saved

FPSO Coating Application — Scottish Waters

A rope access team of 4 technicians applied anti-corrosion coating to FPSO hull and turret areas over a 14-day campaign. 2,400m² coated to NORSOK M-501 specification. No dry-docking was required, saving the operator £800,000 in vessel downtime and charter costs.

  • 4 IRATA L3 technicians, 14-day offshore campaign
  • Sa 2½ prep, epoxy primer, polyurethane topcoat
  • Wet-film and dry-film thickness recorded per panel
  • Zero safety incidents, zero production impact

/ Enquiry

Book Oil & Gas
Inspection.

Tell us about your platform, FPSO, or flare stack scope. We will respond with a technical assessment and fixed-price quote within 24 hours.

Phone: 0131 496 0882

Email: [email protected]

Response time: <24 hours

Or email directly: [email protected] · Call: 0131 496 0882

WhatsApp Us
Call Now WhatsApp