Oil & Gas Platform Inspection & Maintenance
Offshore platform inspection, flare stack access, FPSO maintenance and coating application. OPITO-compliant rope access teams. 24-hour mobilisation from Edinburgh.
/ Services Offered
Capabilities
Platform Structural Inspection
Legs, nodes, braces, and decks surveyed inside and out. Crack mapping, corrosion assessment, and anode condition recorded with high-res photography.
Flare Stack Inspection & Repair
Live flare stack access for NDT, guy wire inspection, pilot line checks, and structural repair. No shutdown required.
FPSO Hull & Turret Access
Anti-corrosion coating, steel renewal, and turret bearing inspection from ropes. Eliminate dry-docking for routine maintenance.
Coating & Corrosion Protection
Sa 2½ surface prep, epoxy primer, and polyurethane topcoat application to NORSOK M-501 and ISO 12944 C5-M standards.
Anode Replacement
Cathodic protection anode survey, replacement, and installation on jackets, monopiles, and FPSO hulls.
Confined Space Tank Inspection
Entry, cleaning, and inspection of storage tanks, ballast tanks, and process vessels. Stand-by rescue team rigged before entry.
Rigging & Lifting Operations
Offshore rigging, material handling, and lifting point inspection. LOLER-compliant thorough examinations from rope access.
Drop Object Surveys
Systematic survey of derrick, cellar deck, and module areas for loose items. Secondary retention installation where required.
/ Certifications
Offshore Qualified
IRATA
International Rope Access Trade Association Level 3 supervisory certification. Annual re-validation.
OPITO Stage 1/2/3
Offshore Petroleum Industry Training Organisation. Rigger, banksman, and rope access technician standards.
BOSIET / FOET
Basic Offshore Safety Induction and Emergency Training. Helicopter escape, sea survival, fire-fighting, and first aid.
OGUK Medical
Oil & Gas UK offshore medical examination. Fit for work in the UK Continental Shelf.
PCN NDT
Personnel Certification in Non-Destructive Testing. UT, MPI, DPI Level 2 inspectors with rope access capability.
/ Case Study
Proven in the Field
FPSO Coating Application — Scottish Waters
A rope access team of 4 technicians applied anti-corrosion coating to FPSO hull and turret areas over a 14-day campaign. 2,400m² coated to NORSOK M-501 specification. No dry-docking was required, saving the operator £800,000 in vessel downtime and charter costs.
- 4 IRATA L3 technicians, 14-day offshore campaign
- Sa 2½ prep, epoxy primer, polyurethane topcoat
- Wet-film and dry-film thickness recorded per panel
- Zero safety incidents, zero production impact
/ Enquiry
Book Oil & Gas
Inspection.
Tell us about your platform, FPSO, or flare stack scope. We will respond with a technical assessment and fixed-price quote within 24 hours.